Apply Now
Choose required connection type:
- Domestic connection
- Commercial connection
- Multiple domestic connections
- Multiple commercial connections
- Disconnection
- Load change
- Alteration
- Generation connection (G98/NI) stage 1 registration
- Generation connection (G98/NI) stage 1 commissioning
- Generation connection (G98/NI) stage 2 application
- Generation connection (G98/NI) stage 2 registration
- Generation connection (G98/NI) stage 2 commissioning
- Generation connection (G99/NI)
- Generation connection (G99/NI Fast Track)
- DFI Streetlighting
What Type of Connection do you need?
Let us guide you through the process
Do you already have an electricity connection?
Does our equipment need moved or replaced?
Do you want a new connection?
Does the cable need moved, or the meter need moved or replaced?
Other equipment
Service cable only
Meter only
Do you want it disconnected?
Do you want to increase or decrease your supply?
Do you want to connect generation?

We would like to help you, please contact our dedicated connection team
MONDAY – FRIDAY: 8am to 8pm, SATURDAY: 9am to 5pm
Single or three phase?
Single Phase
Three Phase
Below 3.68kW?
Below 11.04kW?
Based on your answers, your requirements are...
Connecting Small/Large scale generation (G99/NI)
What do you want to connect?
Home
Business
Multiple
Generation up to 3.68kW Single Phase or 11.04kW Three Phase (G98/NI)
Generation over 3.68kW Single Phase or 11.04kW Three Phase (G99/NI)
What type of multiple connection?
Home
Business
Based on your answers, your requirements are...
A micro generation connection (G98/NI)
Based on your answers, your requirements are...
A small/large scale generation connection (G99/NI)
Is our equipment in your way?

We would like to help you, please contact our dedicated connection team
MONDAY – FRIDAY: 8am to 8pm, SATURDAY: 9am to 5pm
