Wind Farm Setting Schedule
The WFPS Setting Schedule applies to Wind Farm Power Stations with a registered capacity equal to or greater than 5MW connected before 27 April 2019.
Wind Farm Setting Schedule
Was this information helpful?
Current rating: 0 (0 ratings)