Housing sites with 12 or more dwellings will still be priced by multiplying the Standard Connection Charge by the number of houses to be connected. This price will make up the full works quotation (option 1) in the dual offer. The non contestable works quotation (option 2) will include costs for the non-contestable works, ICP design review, ICP inspections and ICP legal review only.