Guide prices for load change

What service do you need?

Average time to receive a quotation

Average timescale after payment

Average price (ex.VAT)

Upgrade the electricity supply for one home or a farm*

If you have a load of over 100 Amps that supplies one meter, it will mean you need Current Transformer Metering (CTs) installed (if you do not already have it).**

15 days

6-8 weeks

Our price is from £4,800***

Upgrade the electricity supply for a business property*

If you have a load of over 100 Amps that supplies one meter, it will mean you need Current Transformer Metering (CTs) installed (if you do not already have it).**

15 days

6-8 weeks

£2,500
>70kVA
£8,400
70kVA - 1000kVA
£800,000
<1000kVA

 

* You would apply for an upgrade when you have an existing electricity connection and you are undertaking changes that require more power. You will need to tell us what you are doing and the extra power you require and may need to employ the services of a qualified electrician to help you determine this information.We will assess whether your existing cable or overhead line is able to carry the increased power and also whether it is available from the local network.

If capacity is available and your cable/line is suitably sized it may be that you only need to have your meter changed, in which case you would need to contact your electricity supplier.

If your cable or line is not of a suitable size we will need to bring in a larger service to your property and disconnect the existing service. CT metering may or may not be involved but you are likely to need a new meter in any case. All of these works need to be carried out on the same day if you are not in a position to be without power; this will require you to co-ordinate the appointments with NIE Networks and your electricity supplier.
**NIE Networks would organise the installation of the CTs and your electricity supplier would arrange for their metering agents to fit a new meter. This will need to occur on the same day to ensure you are not left without power.
***You may be required to pay a builder to carry out additional work such as the excavation of a cable track.
Legal disclaimer: We have developed the guides to prices and timescales to assist you with connections applications. They give a general illustration of connections cost and time to connect only and cannot be relied upon to assess the terms of connections for specific premises.


Nothing in this disclaimer limits or excludes our liability for (a) death or personal injury caused by our negligence; (b) fraud or fraudulent misrepresentation; or (c) any other liability that cannot be limited or excluded by applicable law.

Subject to the above, we shall not be liable to you in tort (including negligence) or otherwise, arising under or in connection with your use of the guide prices and timescales for: (a) loss of profits; (b) loss of sales or business; (c) loss of agreements or contracts; (d) loss of anticipated savings; (e) loss of or damage to goodwill; or (g) any indirect or consequential loss

 
  What does this cover? Average timescale for a quotation Average timescale after payment Average price (ex.VAT)  

Upgrade the electricity supply for a business (commercial property)

You would need to apply for an upgrade when you have an existing electricity connection and you are undertaking changes that require more power.

You will need to tell us what you are doing and the extra power you require. You may need to employ the services of a qualified electrician to help you determine this information.

We will assess whether your existing cable or overhead line is able to carry the increased power and also whether it is available from the local network.

If capacity is available and your cable/line is suitably sized it may be that you only need to have your meter changed, in which case you would need to contact your electricity supplier.

If you have a load of over 100 Amps that supplies one meter, it will mean you need Current Transformer Metering (CTs) installed (if you do not already have it). NIE Networks would organise the installation of the CTs and your electricity supplier would arrange for their metering agents to fit a new meter. This will need to occur on the same day to ensure you are not left without power.

If your cable or line is not of a suitable size we will need to bring in a larger service to your property and disconnect the existing service. CT metering may or may not be involved but you are likely to need a new meter in any case. All of these works need to be carried out on the same day if you are not in a position to be without power; this will require you to co-ordinate the appointments with NIE Networks and your electricity supplier.

 
15 days 6-8 weeks from payment


Load less than 70kVA


Load between 70 and 1000kVA


Load over 1000kVA
£2,500
(average)


£8,400
(average)


£800,000
(average)
x

Upgrade the electricity supply for one home or a farm

You would need to apply for an upgrade when you have an existing electricity connection and you are undertaking changes that require more power.

You will need to tell us what you are doing and the extra power you require. You may need to employ the services of a qualified electrician to help you determine this information.

We will assess whether your existing cable or overhead line is able to carry the increased power and also whether it is available from the local network.

If capacity is available and your cable/line is suitably sized it may be that you only need to have your meter changed, in which case you would need to contact your electricity supplier.

If you have a load of over 100 Amps that supplies one meter, it will mean you need Current Transformer Metering (CTs) installed (if you do not already have it). NIE Networks would organise the installation of the CTs and your electricity supplier would arrange for their metering agents to fit a new meter. This will need to occur on the same day to ensure you are not left without power.

If your cable or line is not of a suitable size we will need to bring in a larger service to your property and disconnect the existing service. CT metering may or may not be involved but you are likely to need a new meter in any case. All of these works need to be carried out on the same day if you are not in a position to be without power; this will require you to co-ordinate the appointments with NIE Networks and your electricity supplier.

 
15 days 6-8 weeks from payment Our price is from £4,800

You may be required to pay a builder to carry out additional work such as the excavation of a cable track.
 


Legal disclaimer: We have developed the guides to prices and timescales to assist you with connections applications. They give a general illustration of connections cost and time to connect only and cannot be relied upon to assess the terms of connections for specific premises.

Nothing in this disclaimer limits or excludes our liability for (a) death or personal injury caused by our negligence; (b) fraud or fraudulent misrepresentation; or (c) any other liability that cannot be limited or excluded by applicable law.

Subject to the above, we shall not be liable to you in tort (including negligence) or otherwise, arising under or in connection with your use of the guide prices and timescales for: (a) loss of profits; (b) loss of sales or business; (c) loss of agreements or contracts; (d) loss of anticipated savings; (e) loss of or damage to goodwill; or (g) any indirect or consequential loss.


 

Was this information helpful?