RfG Parameter Consultation

RfG Parameter Consultation [946kB PDF] - SONI and NIE Networks’ proposal for the general application of technical requirements in accordance with Articles 13–28 of the Commission Regulation (EU) 2016/631 establishing a network code on requirements for grid connection of generators.

Responses should be submitted to SONI at gridcode@soni.ltd.uk before 5pm on 9 February 2018Download a template for response [36kB Excel] 

This public consultation document is produced jointly by SONI in its role as the Transmission System Operator in Northern Ireland and NIE Networks in its role as the Distribution System Operator in Northern Ireland.

The TSO and DSO are issuing this consultation document on the non-mandatory requirements and non-exhaustive parameters in the interest of transparency and to ensure that the TSO and DSO have the best information available to them to submit an appropriate set of recommendations to the CRU for the proposal of requirements of general application.